Marc Brunel’s Account of the Thames Tunnel

Meeting of April 11, 1837

Mr. Brunel gave an account of the Thames Tunnel. Having described the nature and difficulties of the undertaking, and the previous attempts which had been made by others to effect a similar work, he explained, by reference to sections, the nature of the strata below the river. He had adopted the rectangular form of the present excavation, because the work would set better than if it had been of any other form, and it also had a better sustaining surface. The necessity of supporting the ground, and of having a sufficient shelter, had led to the adoption of the shield, respecting which so much had been said. The construction of this would be most easily understood, by conceiving twelve books set side by side on their ends. These would represent the parallel frames which, standing side by side, but not in immediate contact, filled up the excavation. Each frame was divided into three boxes or cells, placed one above the other, the adjustment of the floors of which, and other details, were minutely described by Mr. Brunel.

Beamish on the Thames Tunnel

By Richard Beamish, M. Inst. C.E.

April 4, 1837

The paper states that several attempts had been made in former years to effect a communication betwixt the opposite shores of the Thames by means of a tunnel, all of which, however, failed. In 1798, Dodd proposed a tunnel at Gravesend; in 1804, Chapman projected one at Rotherhithe; and in 1807, Vazie commenced the construction of a shaft, II feet diameter, at a distance of 315 feet from the river. With Vazie was associated Trevethick, a man of great practical knowledge as a miner, and by indefatigable labor, a drift-way 5 feet in height, 2 feet 6 inches in breadth at the top, and 3 feet at the bottom, was carried 1046 feet under the river. In the spring of 1808, having first ascended from under a rocky stratum, though with a depth of at least 25 feet betwixt them and the bed of the river, the Thames broke in upon them, and not a single brick having been laid, the work was irretrievably lost.

Young Brunel in the Thames Tunnel

The Thames Tunnel has almost ceased to be a wonder; but the conduct of the younger Brunel on the two occasions referred to below can never lose its claim to admiration. The extract is from an article on the tunnel in the Courier & Enquirer, of Saturday : –

The tunnel has been twice inundated, the first time it occurred, the disorder and fright it caused among the workmen was extreme. Neither Mr. Brunel nor his son were there, but one of the superintending engineers, of the name of Griffiths, preserved his presence of mind, rallied the men, and conducted them in safety to the opening before the water had gained the summit of the arch. In a few minutes afterwards, it was filled.

Drilling scene from Georges Méliès’s film Tunneling the English Channel (1907).

Proposed Tunnel Under Dover Straits

The project of tunnelling a passage from England to France under Dover Straits is still talked of in England. The London Daily News of December 25 says of it:

“The plan of tunnelling beneath the Straits is not altogether a new one. Probably the success with which the Mont Cenis tunnel has been worked through the solid backbone of the Alpine range has attracted new attention to a scheme which on the face of it seems far from being impracticable. It must be remembered, however, that the difficulties to be encountered in tunnelling beneath the Straits of Dover are of a totally different character from those which the French engineers have had to meet with in tunnelling through the Alps. The soil to be traversed in the former instance would probably be the ‘second chalk formation,’ which may be assumed to extend in an unbroken course from the place of its uprising in England to the place in which it makes its appearance in France. It need hardly be said that the difficulty of perforating this soil would be very much less than that of perforating the hard and complicated material which has been encountered by the French engineers. On the other hand, however, there are dangers and difficulties in tunnelling under the Straits which more than make up for the comparative ease with which the mere process of perforation could be pursued. It needs but a slight acquaintance with the history of the construction of the Thames Tunnel to enable one to recognize the fact that the workers in the suggested tunnel beneath the Straits would be exposed to enormous risks from the effect of the pressure of the sea upon the stratum through which they would have to work. Again and again the water burst into the Thames Tunnel, and drove the workmen out. Brunel himself nearly lost his life during one of these irruptions. Now, if this happened beneath the Thames, what might be looked for from the effects of the enormous pressure of the sea to say nothing of the increased danger during heavy storms? And then the workmen in the Thames Tunnel had but a comparatively short distance to run, when they were threatened with an irruption of water, if such an event threatened workmen engaged nine or ten miles from either outlet of the suggested tunnel, escape would be hopeless. In a short time the whole length of the tunnel would be filled with the waters of the sea, and the labors of years would be rendered useless.

Elkton and Oxford Railroad

The Cecil Whig, Elkton, MD, January 18, 1873

Enginneer Hood and party reached Elkton last Thursday, in completing the survey and estimate of the line of the proposed railroad between Elkton and Oxford, 18 miles. The estimates are, for grading and masonry, $59,168.23; Engineering, office and incidental expenses, $10,000. Total, $69,168.23. This is the estimate for putting the road in order to receive the cross-ties and rails.

A meeting was held at the office of Hon. Hiram McCullough, and the books opened for subscriptions for stock.

This road, if built, and we hope it will be successfully pushed forward, will be a continuation in this direction of the Peach Bottom Railway, which is now under contract.